IMG_9989
Arzni-Shamiram main canal
00009
Yerevan Combined-Cycle Thermal Power Plant
00004
Fish-protecting structures of Sevan HPP
00005
Sevan-Dilijan road tunnel
00003
Dilijan Drainage Tunnel
00002
Flush Weir of the Intake Unit of Noyemberyan 1-st Stage Pumping Station
00007
Yeghegis Aqueduct
00006
Arpa-Sevan tunnel
00008
Kechut Reservoir
IMG_0988
Argel HPP. The chute of no-operation spillway.
Progress Reports

  2021

15.02.2021   Interim Report

2020

16.11.2020   Interim Report

07.08.2020   Interim Report

25.05.2020   Interim Report

17.02.2020   Interim Report

  2019

14.11.2019   Interim Report

14.08.2019   Interim Report

15.05.2019   Interim Report

15.02.2019   Interim Report

2018

14.11.2018   Interim Report

15.08.2018   Interim Report

15.05.2018   Interim Report

15.02.2018   Interim Report

2017

15.11.2017   Interim Report

15.08.2017   Interim Report

15.05.2017   Interim Report

15.02.2017   Interim Report

 2016

15.11.2016   Interim Report

15.08.2016   Interim Report

12.05.2016   Interim Report

15.02.2016   Interim Report

2015

12.11.2015   Interim Report

13.08.2015   Interim Report

15.05.2015   Interim Report

17.02.2015     Interim Report

2014

14.11.2014     Interim Report

13.08.2014     Interim Report 

14.05.2014     Interim Report