Repair of the emergency sections of the Arpa-Sevan tunnel No. 2

Employer: Water Committee

Project:  Repair of the emergency sections of the Arpa-Sevan tunnel No. 2

Number of Contract: ՋԿ-ԲՄԱՇՁԲ-22/7-Ա.

Title of Contract: Repair of the emergency sections of the Arpa-Sevan tunnel No. 2

The volumes of construction works are:

Length of  tunnel sections will be repaired m 220,1
Concrete 2 090,7
Steel bars, reinforcement t 142,0
Injection  m² 7 728,4

Start date of Contract: April 20, 2022