IMG_9989
Arzni-Shamiram main canal
00009
Yerevan Combined-Cycle Thermal Power Plant
00004
Fish-protecting structures of Sevan HPP
00005
Sevan-Dilijan road tunnel
00003
Dilijan Drainage Tunnel
00002
Flush Weir of the Intake Unit of Noyemberyan 1-st Stage Pumping Station
00007
Yeghegis Aqueduct
00006
Arpa-Sevan tunnel
00008
Kechut Reservoir
IMG_0988
Argel HPP. The chute of no-operation spillway.
Other projects

1. 3 km long Tunnel of Kadzharan Tailings Dump;
2. Pedestrian subway under the railroad at Hoketmberyan Railway Station;
3. Apartment house on Gnuni Street in the Yerevan City, – a 6-storeyed masonry work;
4. Mining works at 1 km long stretch at the construction of Inguri HPP;
5. 5-storeyed precast concrete apartment house №56 in Avan-3 Community of the Yerevan City;
6. 5-storeyed precast concrete apartment house №57 in Avan-3 Community of the Yerevan City;
7. 6-storeyed precast concrete apartment house in Ajgestan Community of the Yerevan City;
8. Pedestrian subway on Barekamutyan Street in the Yerevan City;
9. Pedestrian subway at the crossing of Mashtots Avenue with the Main Street;
10. 5 km long Tunnel in Talin Irrigation Scheme;
11. Pedestrian subway on Charents Street in the Yerevan City;
12. 10-storeyed monolitic concrete apartment house of Industrial Association “Sevani” in the Yerevan City;
13. 9-storeyed precast concrete apartment house on Kamo Street of the Yerevan City;
14. A complex of underground works at the stretch of 0.5 km for “Matenadaran”, the Underground Book Depository
15. 5 km long Meghradzor Railroad tunnel;
16. Specialized mining works at the stretch of 360 m for “Dzhukhtag Vank” Culvert in Town Dilijan;
17. Of underground works, sinking of prospecting shaft, driving of drifts for works on the exploration of soil under structures of the second phase of Armenian Atomic Power Plant;
18. Library of the Yerevan Polytechnic Institute;
19. Archival depository of the Council of Ministers of Armenian SSR – 400 m long underground complex;
20. Anti-landslide arrangements in Town Dilijan: specialized underground works at the stretch of 1.52 km in №1 Mets Tana adit;
21. Civil construction and specialized works for the Recreation Department in Settlement Shepsi of Krasnodar country land;
22. Underground works for construction of shower collector on Orbeli Street in the Yerevan City;
23. Anti-landslide arrangements in Town Dilijan: specialized underground works at the stretch of 1.68 km in №2 Mets Tana adit;
24. Specialized underground works at the stretch of 1.68 km in Kaghni Khach adit in the framework of anti-landslide arrangements in Town Dilijan;
25. Underground works for construction works on Rogun HPP;
26. Apartment houses in G-1 Quarter in the Yerevan City;
27. Demolition of structures in Town Spitak ,- drilling and blasting works, specialized works;
28. Construction of road-transport tunnel under the Pushkin Pass, – mining and grouting works;
29. Anti-landslide arrangements in the vicinity of the “Moviemaker’s House”,- underground and special type works at the stretch of 0.3 km;
30. Construction of cast-in-situ apartment houses in Town Gyumri (“Ani” and “Shirakatsi” quarters) – fourteen 4-storeyed cast-in-situ buildings;
31. Sewage collectors in the Yerevan City – underground works at the stretch of 1.07 km;
32. Underground car parking place in the Yerevan City.