IMG_9989
Arzni-Shamiram main canal
00009
Yerevan Combined-Cycle Thermal Power Plant
00004
Fish-protecting structures of Sevan HPP
00005
Sevan-Dilijan road tunnel
00003
Dilijan Drainage Tunnel
00002
Flush Weir of the Intake Unit of Noyemberyan 1-st Stage Pumping Station
00007
Yeghegis Aqueduct
00006
Arpa-Sevan tunnel
00008
Kechut Reservoir
IMG_0988
Argel HPP. The chute of no-operation spillway.

The  Client: “PAR SAM ERBAYRNER” Ltd. The main scope of work: 1. Earthwork 5 770.00 m3 2. Concrete 4 218.80 m3 3. Reinforcement and metal constructions 253.16 t    

The Customer is the “Water Committee ” SI.

The Client: “Park Group” LLC

The Client: “Metsn Erik” Ltd.

The Client: “Water Resources Development and Institutional Improvements PIU” SI

The Client: “State Procurement Agency” State Non-profit Organization.

The Client: Armenian Water and Sewerage Company CJSC

The Client “International Energy Corporation” CJSC

The Client: DIS Properties Benevolent Foundation

The Client: “International Energy Corporation” CJSC

The Client: “Metsn Erik” Ltd.

The Client: “Water Resources Development and Institutional Improvements PIU” SI of the State Committee of Water System of the Ministry of Territorial Administration of RA.

The Client: “Metsn Erik” Ltd.

The Client: “Djrasahk” Ltd.

The Client: “Metsn Erik” Ltd.

The Contractor: the Armenian Branch of “FARMEX Technologies” Ltd.

The Client: “Water Resources Development and Institutional Improvements PIU” SI of the State Committee of Water System of the Ministry of Territorial Administration of RA.

The Client: International Power Engineering Corporation

The Client : “Water Resources Development and Institutional Improvements PIU” SE of the State Committee of Water System of the Ministry of Territorial Administration of RA.

Source of financing: Japan International Cooperation Agency
The Client: ”Yerevan TPP” CJSC of the Ministry of Energy and Natural Resources of the Republic of Armenia:

The project anticipated strengthening the dumb, to build a new spillway and set the alert system.

The Client: “Water Sector Development and Institutional Improvements PIU” SE, Ministry of Agriculture

The Client: ”Silvi & G” LTD

The Client : “Water Resources Development and Institutional Improvements PIU” SE of the State Committee of Water System of the Ministry of Territorial Administration of RA.

The Client: “Construction of Roads” PIU of Ministry of Finances and Economy of RA.

The Client: Ministry of Urban Development of RA, State Enterprise “Hydraulic Structures”.

The Client: ”Bazenk” CJSC

The Client: «ALSTOM POWER»

The Client: SE “Sevan-Hrazdan Cascade of HPP” CJSCo. RA

The Client: PIU “Rehabilitation of Irrigation Schemes” of Ministry of Agriculture.

The Client: SE “Sevan-Hrazdan Cascade of HPP” CJSCo. RA

The Client: Ministry of Transport of RA, Administration of the Construction of Yerevan Subway.

The Client: “Vorotan HPP Systems” SCJSC of the Power Engineering and Electrification of USSR.

The tunnel has been driven from four faces, the first and the fourth faces being drifted from the intake and outlet portals respectively, and the corresponding counter second and third faces drifted from Shaft No.1. The diameter of Shaft No.1 is 6 m and its height is 192 m.

The Client: the Ministry of Trade RA, the Management of the Construction of Yerevan Underground of RA

The Client: “Armglavenergo” of the Ministry of Power Engineering and Electrification of USSR.

The transition structure between the Tunnel No.1 and Tunnel No.2 of the Arpa-Sevan