2016 Construction storage Amulsar gold mine for rocks not rich in gold

Client: “Lydian Armenia”

The purpose of work is to build a Barren rock storage facility for the rocks coming from the main pit with its underdrain and over drain systems, massive earthwork, soil liner embankment, as well as construction of different infrastructures.

The main work activities are:

  1. Soil excavation and transportation up to 2 km
325 000 m3
  1. Till/soil liner embankment
60 000 m3
  1. In-situ soil liner preparation
300 000 m2
  1. Installation of drain pipes of different diameters
6 200 m
  1. Construction of earth dam
26 000 m3
  1. Construction of soil diversion channels
28 000 m3
  1. Concrete works
100 m3