2016-2017 Demolition, repairmen and reconstruction of tunnel No.2 on road Vanadzor-Alaverdi-Georgian border at PM 30 + 125 – PM 38 + 450

The  Client: “Kapavor” Ltd.

The main scope of work:

1. Earthwork 13 662.35 m3
2. Concrete 2 417.1 m3
3. Reinforcement and metal constructions 76.73 t
4. Pipelines 560.0 m