2014 Rehabilitation of Hrazdan HHP Derivation Channels

The Client: “International Energy Corporation” CJSC

Reconstruction of Hrazdan HPP derivation channels, as well as rehabilitation of pressure basin and master node were performed.

The scope of works

1. Concrete cover 3145,72 m3
2. Reinforcement 66,18 t
3. Preparatory layer of concrete В7.5 468,8 m3
4. Concreting 13 516 m2