The Client: Armenian Water and Sewerage Company CJSC

Construction site was located 130 km far from Yerevan in the area of Martuni regional center. Works included construction partly construction of new Water Supply Network in Martuni. Mainly axes of network pass along city road and construction was conducted in city traffic conditions.

Total volumes completed:

     1. Thin shaped trench excavation and backfill, depth within 1 m – 1.5 m 70062 m3
     2. Demolition and Reinstatement of asphalt concrete roads
     3. Construction of water pipelines whith length OD40-OD200 PE  in                        . distribution network including water tightness testing  25300 m
     4. Construction of 7600 meter length OD25 PE water pipelines for house             .   connections 1088 units
     5. Installation of  water meter chambers 1088 units
     6. Installation of r/c pre cast chambers D1500- D2000mm 33 pieces