The Client :  “Water Resources Development and Institutional Improvements PIU” SE of the State Committee of Water System of the Ministry of Territorial Administration of RA.

The rehabilitation of 3944 lin.m stretches of the canal was implemented out of the vegetation period.

The following works have been performed:

1. Rehabilitation and renovation of the adjacent road;
2. Earthworks 12185.37 m3
3. Canal cleaning of the sediments and detritus, partial demolition of concrete offsets – 1465.98 m3
4. Clean the canal bottom and walls of deteriorated concrete;
5. Place peddle gravel and sand mix mattresses;
6. Concrete works  6442.76 m3
7. Expansion and movement joints  17980.93 m

A range of winter time conceting measures, such as antifrosting agents, concrete cover and heating, as well as well as preliminary warming of