2006-2007 Rehabilitation of Kechut Dam

The project anticipated strengthening the dumb, to build a new spillway and set the alert system.

 The following scope of work was implemented:

1. Earthworks  19482 m3
2. Asphalt carpet  41233 m2
3. Concrete and reinforced concrete  1358 m3
4. Installation of reinforcement  71.8 t
5. Shotcrete 2652 m2
6. Precast reinforced concrete  38 m3
7. Insulation of pipelines  859 m
8. Cement injection  8766.5 m2
9. External insulation  3698 m2