2004-2006 Talin SHPP Construction

The Client: ”Silvi & G” LTD

The following main scope of work was implemented:

1. The earthworks 32123 m3
2. Concrete and reinforced concrete 1510 m3
3. Installation of reinforcement 39.4 t
4. Steel structures 1100 t
5. Laying of pipelines 2604 m