2003-2004 Construction of DRP in Sari-Tagh region in the Yerevan City

The Client: “Dzhrmugh-Kojughi” CJSC
The works were executed in the frameworks of Municipal Development Program.

The complex of structures consists of the following main projects:

1. Banked 4000 m3 capacity Daily Regulation Pond from precast reinforced concrete structures with cast-in-place reinforced concrete bottom;
2. Two rooms of absorbent-type filters with control-and-measuring instrumentation for the control of water level in the basin;
3. Pipelines – feeding, lateral and supply ones;
4. Premises of operation services.
The following main scope of works has been implemented:

     1. The earthwork  15753 m3
     2. Concrete and reinforced concrete  737.8 m3
     3. Precast reinforced concrete  244.1 m3
     4. Peddle gravel sand mattress  562.5 m3
     5. Installation of reinforcement  13.6 t
     6. Steel structures  19.4 t
     7. Pipelines  1040 m
     8. External insulation of pipelines  888 m
     9. The insulation works  2320 m2
     10. Shotcrete  135 m2
     11. The stone-work  26.4 m3
     12. Roofing  43.0 m2
     13. Installation of communications transmission lines  1.5 km
     14. 0.4 kV transmission line  0.47 km
     15. Asphalt carpet  1800 m2
     16. Planting of greenery in the territory  3900 m2
     17. Electrotechnical works.
     18. The building of operation and security guard services of 32 m2 usable area.