The Client:  “Construction of Roads” PIU of Ministry of Finances and Economy of RA.

The tunnel construction works were recommenced after a very lengthy standstill, that had a negative effect on the structures constructed earlier. The works were conducted simultaneously from Northern and Southern Portals. The driving of tunnel at the stretch of about 200 m length was executed under utterly complicated mining-and-geological conditions that required special drifting methods with segregated-phase mining of rocks, strengthening of temporary roofing. The lining of tunnel in earlier constructed sections and the ceiling of air ducts have been reconstructed. The works on waterproofing and on drainage system, on the roadbed in the tunnel and the adjoining areas, ventilation system, electric lighting, traffic safety and control of the flow of traffic have been executed.
The works implemented on outer engineering networks, communications and structures include:

1. Construction of buildings for the maintenance and security staff;
2. Laying of 35 kV transmission line and installation of substations;
3. Construction of the pumping house, ventilation building, etc.

As a whole the following main scope of works was implemented:

     1. Earthworks  73774.4 m3
     2. Concrete and reinforced concrete  27796.3 m3
    3. Grouting works 17747,1 m3
    4. Installation of reinforcement  2122.9 t
     5. Steel structures  643 t
     6. Shotcrete  13787.1 m2
     7. Plaster work   17011.8 m2
     8. Drilling of holes   18682.2 m
     9. Laying of pipelines   13817.6 m.
     10. Waterproofing (screen of aluminum sheets)  9.8 t
     11. Peddle gravel mattress  10850.2 m3
     12. Roofing  1223.7 m2
     13. Tile lining   283.8 m2
     14. Block-stone lining – 216.3 m2.
     15. Construction of partitions  505 m2
     16. Basalt border  4843.2 m
     17. The stone-work  151.5 m3
     18. Windows, doors  120.3 m2
     19. Glazing  246 m2
     20. Asphalt carpet  20384.7 m2