1998-1999 Rehabilitation of Arzni-Shamiram Main Canal

The Client: PIU “Rehabilitation of Irrigation Schemes” of Ministry of Agriculture.

The works on 2083 m long stretch of the main canal were implemented mainly in off-season periods in the absence of water in the canal. Besides the rehabilitation works in the canal, the repair of bridges and aqueducts, of water intakes and distribution units have been performed.
The following scope of work has been executed:

1. Earthworks  15151.8 m3
2. Concrete and reinforced concrete  6209.5 m3
3. Cleaning of concrete surfaces  28749 m2
4. Precast reinforced concrete structures  990.4 m3
5. Driving of anchors  747 pieces.
6. Shotcrete works  8333.2 m2
7. Insulation works  5627.1 m2
8. Plaster works  1101.0 m2
9. Movement and expansion joints 10277 m
      10. Steel structures  21.4 t
      11. Painting of barriers  1512 m2
      12. Construction of power lines  1190 m
      13. Asphalt carpet  560 m2