2008-2010 Yerevan Combined Cycle Power Plant

Source of financing: Japan International Cooperation Agency

The Client: ”Yerevan TPP” CJSC of the Ministry of Energy and Natural Resources of the Republic of Armenia:
Consultant: TEPSCO LTD, Japan:
EPC Contractor: Consortium of Mitsui & Co LTD and GS Engineering & Construction company, Japan and South Korea:

Installed (electric and thermal) capacity of the Power Unit: 271,7 MW
Installed electric capacity of the Power Unit: 242 MW

By putting the new Power unit into operation, the reliability of the Power System was increased, the regimes of supply on the loading curve was improved, the rates of flows inside the system were optimized, thus decreasing electric losses in electric networks.

The following main scope of work was implemented:

1. The earthworks 203318.3 m3
2. Concrete and reinforced concrete 14150.69 m3
3. Installation of reinforcement 1400 t
4. Steel structures 50 t
5. Laying of pipelines 2984.75 m
6. Asphalt carpet 11500 m2