2015-2016 “Construction of outflow canals of Qakhtsrashen, Avshar-Aygevan, Armash, Arazap, Jrashen-Azat and Zovk pumping stations”

The Client: “Water Resources Development and Institutional Improvements PIU” SI

 The purpose of the construction works is to reconstruct the Kaghtsrashen II level water reservoir, Avshar-Aygevan village, Armashy district, Arasapi district, Jrashen-Azat I degree water removal canals and Rehabilitation of the rehabilitated canal will result in the improvement of the canals’ technical condition, reduction of filtration losses as possible, improving water management in irrigation systems, decreasing exploitation and maintenance costs, increasing irrigated land at the expense of saved electricity

The following scope of works was implemented:

1. Earthworks 27016.2  m3
2. Shotcreting 2255 m3
3. Reinforcement 2649.3 kg
4.  Installation of reinforced concrete construction of LR-8 type 114.1 m3
5. Installation of reinforced concrete construction of LR-6 type 782.4 m3
6. Installation of reinforced concrete construction of LR-4 type 612.2 m3
7. Valves 187 units