2000-2002 The Yerevan Central Heating-and-Power Plant

The Client: Yerevan CHPP CJSC.

The Yerevan Central Heating-and-Power Plant. Repair of Reinforced Lining and Reconstruction of the Sprinkler of Cooling Tower № 1.

The following main scopes of works have been implemented:

     1. Shotcrete 13312 m2
     2. Concrete and reinforced concrete  151.2 m3
     3. Installation of reinforcement  42.17 t
     4. Steel structures  27.31 t
     5. Plaster work  1520 m2
     6. Pipe laying  140 t
     7. Wooden structures  492 t
     8. Preparation and mounting of sprinkler units of corrugated asbestos states  46478 m2