IMG_9989
Arzni-Shamiram main canal
00009
Yerevan Combined-Cycle Thermal Power Plant
00004
Fish-protecting structures of Sevan HPP
00005
Sevan-Dilijan road tunnel
00003
Dilijan Drainage Tunnel
00002
Flush Weir of the Intake Unit of Noyemberyan 1-st Stage Pumping Station
00007
Yeghegis Aqueduct
00006
Arpa-Sevan tunnel
00008
Kechut Reservoir
IMG_0988
Argel HPP. The chute of no-operation spillway.
2004-2006 Gravity Irrigation of the Lands of Vayots Dzor Marz

The Client: “Water Sector Development and Institutional Improvements PIU” SE, Ministry of Agriculture

For construction of this project the implementation of the following works were required:

  1. Renewal and widening of the existing intake dam near Village Germon, to supply water to the operating Power Plant (Water intake № 1);
  2. Construction of a new intake dam (Water intake № 2) at the distance of nearly 2.9 km downstream the river;
  3. Each water intake will supply water via separate pipelines that run along the same route to the Vernashen Pumping Station;
  4. The lengths of main water lines beginning from the intakes № 1 and № 2 are 19.12 km and 16.18 km respectively that consist of steel pipes of 1000 mm in diameter (except for 4.21 km long initial part of the water line from intake № 2 that consists of ø 1200 mm steel pipes), equipped with required control air release vents and emptying gate valves and counters located in wells.

The following main scopes of works have been executed:

1. Earthworks  457 705 m3
2. ø 1020 mm pipe laying  39 800 m
3. Metallic work-pieces  34,14 t
4. External insulation of pipes  39 840 m
5. Internal flashing of the pipelines  114 575 m2
6. Concrete and reinforced concrete  3560 m3
7. Making of expansion and movement joints  359 m