2013-2014 Design and Construction of Wastewater Treatment Plants in Dilijan and Jermuk

The Client: Armenian Water and Sewerage Company CJSC

The mechanical sewage station of 200 l/w build on the right bank of the Aghstev River, 12 km down the town of Dilijan. It provides an opportunity to have wastewater treatment facilities without a sewage pumping station both in Dilijan, one in Teghut and one in Haghartsin communities.

The scope of works:

1. Ferroconcrete 550 m3
2. Reinforcement 70 t
3. Underground and ground pipelines 1260 m
4. Pumps 6 units
5. 2.5m high fence 1345 m
6. Asphalt carpet laying 2448 m2

The mechanical sewage station built at the west part of Kechut reservoir, in 3.5 km of the town of Jermuk provides an opportunity for Jermuk and adjacent areas to discharge the wastewaters to the existing sewage reservoir along the wets part of Kechut reservoir.

The scope of works:

1. Ferroconcrete 537 m3
2. Reinforcement 70 t
3. Underground and ground pipelines 1752 m
4. Pumps 6 units
5. 2.5m high fence 660 m
6. Asphalt carpet laying 1700 m2