IMG_9989
Arzni-Shamiram main canal
00009
Yerevan Combined-Cycle Thermal Power Plant
00004
Fish-protecting structures of Sevan HPP
00005
Sevan-Dilijan road tunnel
00003
Dilijan Drainage Tunnel
00002
Flush Weir of the Intake Unit of Noyemberyan 1-st Stage Pumping Station
00007
Yeghegis Aqueduct
00006
Arpa-Sevan tunnel
00008
Kechut Reservoir
IMG_0988
Argel HPP. The chute of no-operation spillway.
2015 The Renovation of Hrazdan HHP Derivation Channels

The Client “International Energy Corporation” CJSC

“Hrazdan”, “Argel” and “Arzni” HPPs are part of Sevan-Hrazdan cascade of HPPs of the energy system of the Republic of Armenia. The target of  projects was restoration of damaged tunnels of the aqueducts of derivation channels of HPPs, as well as the head units. The design was implemented by “Armhydroproject Institute” CJSC. Restoration works were done in tunnels № 1, №2 and №3 of Razdan HPP as well as at the head units and derivation channels.

 Restoration includes cleaning from sediment, demolition and removal of damaged reinforced concrete and 15 cm thick reinforced concrete laying.

All activities were carried out mainly in the winter time after the irrigation period. Concrete  works  at winter conditions were carried out using appropriate technological standards and requirements.

The scope of works

      1. Concrete Covering 1127,4 m3
      2. Reinforcement 66,18 t
      3. Concreting 481 m2